Finished Water Reservoir Mixing - TMS

Share on Social Networks

Share Link

Use permanent link to share in social media

Share with a friend

Please login to send this presentation by email!

Embed in your website

Select page to start with

Post comment with email address (confirmation of email is required in order to publish comment on website) or please login to post comment

4. Chlorine Residuals are Consistent Throughout Tank

2. Typical Elevation View – Reservoir Inlet/ Outlet Header End Sections Side Section

5. Inlet/Outlet System is Effective – Response is Positive • Initial fill produced 6-8 foot jets into free air • Surface float moved 3 feet in 5 seconds • Chlorine residuals are consistent throughout tank • Chlorine residuals throughout system have increased

1. Site Plan Eugene Water & Electric Board (2) 1MG Reservoirs Courtesy Brown & Caldwell

3. 2 Minutes 15 Minutes 60 Minutes 30 Minutes CFD Modeling Conducted by Red Valve Co.

Views

  • 15 Total Views
  • 11 Website Views
  • 4 Embeded Views

Actions

  • 0 Social Shares
  • 0 Likes
  • 0 Dislikes
  • 0 Comments

Share count

  • 0 Facebook
  • 0 Twitter
  • 0 LinkedIn
  • 0 Google+